By jeff Kann | Houseworks Inc.
Home remodeling comes with its own language—from architectural terms to construction jargon that can leave homeowners feeling lost. This comprehensive glossary translates essential remodeling terminology and FAQ into plain English, helping you to understand and make informed decisions about your project.
Key Terminology
Design-Build
One team performs both design and construction under a coordinated process—fewer handoffs, fewer surprises.
Pre-Construction
- Develop and document project scope and specifications
- Determine construction means, methods, and costs
- Submit all necessary permit applications
- Build schedules
- Contract with suppliers and subcontractors
Schematic Design
Early layouts that test space planning, flow, and function before details are locked in.
Construction Documents (CDs)
Detailed drawings and specifications used for permitting, pricing, and building.
Scope of Work
What’s included (and excluded) so expectations are crystal-clear.
Change Order
A formal record of approved changes to scope, cost, or schedule after work begins.
Punch List
The final checklist of touch-ups and verifications before closeout and warranty.
Allowance
A placeholder budget line for items you’ll select later (tile, lighting, finishes).
Lead Time
The span between ordering and delivery—sometimes weeks, sometimes months, depending on materials.
Value Engineering
Smart adjustments to design or methods that preserve quality while meeting budget.
Frequently Asked Questions
What’s the difference between design-build and design-bid-build?
With design-build, you hire one team to design and build your project under one contract. Design-bid-build splits the process—creating more handoffs and potential gaps in accountability and communication.
How much will my remodel cost?
We align on a budget during design and refine with real-time pricing. Typical Houseworks project budgets—the all-in costs—range between $500,000–$2,500,000
How long will it take?
From concept to move-in, time lines are based on the size of the project, permitting, and lead times. Typical projects for Houseworks range from 4-12 months for design and permitting, 6-18 months for construction.
Do I need to move out during construction?
For reconfigurations of major living spaces, clients choose to find temporary housing. Daily construction brings noise, dust, limited access, and periodic utility shutoffs. If the scope is smaller or can be well contained, we can phase the job or set up dust barriers eliminating a move out.
What’s included in your process?
Concept to warranty: design, permitting, construction, selections, site management, and clear communication—through one team.
How do you handle unexpected issues?
We communicate discoveries promptly, and present transparent solutions (cost & schedule) before proceeding.
Permitting in San Francisco: What should I expect?
Historic housing stock, dense neighborhoods, and layered reviews make SF permitting nuanced. We plan submittals and review time lines up front, then coordinate inspections to keep work moving.
How do you keep projects on budget?
It takes thorough planning, attention to details, and concrete schedules.
We price at each design phase, align scope early, and value-engineer thoughtfully—before purchases or work are authorized.